Project description:
Enhancing gasoline production in Basrah Refinery
Country:
Iraq
City:
Basrah
Completed:
2006
End customer:
SCOP Iraq
Project description
This project concerns heavy naphtha hydrogen desulphurisation for consequential catalytic reforming with front-end separation of light and heavy naphtha. For the general contractor UNIS, a.s., basic and detailed design was prepared by CHETENG Engineering, s.r.o. for the following units:
The unit of heavy naphtha desuplhurisation is performed on the basis of the French licensor AXENS´s licence. Capacity of the heavy naphtha hydrogen desulphurisation unit is 6 700 barrels/day. Capacity of the light and heavy naphtha separation unit is 17 000 barrels/day.
In April 2010, CHETENG Engineering, s.r.o. executed site supervision.
- separation of light and heavy naphtha
- naphtha hydrotreating complex
- flare system.
The unit of heavy naphtha desuplhurisation is performed on the basis of the French licensor AXENS´s licence. Capacity of the heavy naphtha hydrogen desulphurisation unit is 6 700 barrels/day. Capacity of the light and heavy naphtha separation unit is 17 000 barrels/day.
In April 2010, CHETENG Engineering, s.r.o. executed site supervision.
Licensor:
AXENS